Turnkey kitchen renovation in Dubai: kitchen with timber cabinets, built-in appliances and a dining table

Turnkey Kitchen Renovation in Dubai

Kitchen renovation in Dubai, turnkey: layout, plumbing, gas and power for appliances, extraction, walls, flooring, cabinet and worktop installation.

Message us on WhatsApp
10+
Years of experience
15
Specialists
6
Disciplines
90+
Projects

What turnkey kitchen renovation includes

The scope is agreed after a survey and depends on how much of the existing kitchen you keep.

  1. 01Measurements and layout, coordinated with the cabinet maker
  2. 02Removal of old cabinets, tiles and fittings
  3. 03Water and drainage points for sink, dishwasher and fridge
  4. 04Dedicated circuits for oven, hob and other appliances
  5. 05Gas connection where the building has a gas supply
  6. 06Walls, ceiling, lighting and flooring
  7. 07Installation of cabinets, worktop, splashback and appliances
01

Cabinets first, then the walls

The most common kitchen mistake is to finish the walls before the cabinet drawings are fixed. Then sockets end up behind a tall unit, the water point misses the sink and the hood duct does not line up. We start from the cabinet layout with exact appliance models, and only then set out all the points. Stone and quartz worktops are templated on site after the base units are installed.

02

Gas, extraction and electrics

Many Dubai towers have a central gas system, and villas often use LPG. Any change to gas pipework must be done by an approved gas contractor with the building's or supplier's approval, and the hob position is planned around it. In apartments without gas, an induction hob needs a dedicated circuit of the right capacity.

Extraction is a frequent problem: many apartments only allow a recirculating hood, while villas can usually duct to outside. We check what the building allows before choosing the hood. Every major appliance gets its own circuit so that the oven, hob and dishwasher can run at the same time.

03

Materials for a Dubai kitchen

Kitchen finishes have to withstand heat, steam, grease and frequent cleaning. We recommend porcelain or engineered stone for worktops and splashbacks, moisture-resistant boards for carcasses near the sink, and washable paint. In open-plan kitchens, which are common in Dubai apartments, we pay attention to the AC layout so cooking heat does not overload the living area and grease does not collect on diffusers.

04

How the work runs and what affects cost

After the survey and approved layout we obtain the building NOC, carry out strip-out and first-fix services, finish walls and floors, and then install cabinets, worktops and appliances. Hidden pipework and wiring are shown to you before they are closed.

The cost of kitchen renovation depends on the size of the room, whether the sink or hob moves, the volume of electrical and plumbing work, the cabinet system, worktop material and appliances.

Process

How we run a project

A clear route from the first meeting to handover of the finished building.

  1. 1

    Consultation & site assessment

    We discuss the brief, budget and constraints, then survey and measure the site.

  2. 2

    Architectural design

    We develop the concept and a full set of project documentation.

  3. 3

    Approvals & permits

    We clear the government approvals and obtain the required permits.

  4. 4

    Estimate & planning

    We prepare a detailed cost estimate, a work schedule and a delivery plan.

  5. 5

    Construction & handover

    We build and supervise on site, then hand over the finished building with full documentation.

Questions and answers

Short answers to the questions clients ask most often before a project starts. If yours is not here, write to us and we will advise on your project.

Can the sink be moved to the window or an island?

Often yes, if the drain can reach the riser with the correct fall. An island sink may need a raised floor or a pump, which we assess during the survey.

Do you install the kitchen cabinets?

Yes. We can supply the cabinets or install a kitchen you ordered, coordinating the points with the cabinet drawings.

Can I open the kitchen to the living room?

Usually yes, if the wall is not structural and the building approves it. Smoke detection and extraction then need to be reviewed for the open layout.

Can a gas hob be moved?

Only with an approved gas contractor and the building's or supplier's consent. We plan the layout around that before work starts.

Every remarkable project begins with a first step

From concept to delivery — we create architecture that unites aesthetics, function and engineering precision.

Message on WhatsApp