Hotel Refurbishment in Dubai
Hotel refurbishment in Dubai: guest rooms, bathrooms, corridors, lobby and F&B areas, MEP upgrades and phased works that keep the hotel operating.
- 10+
- Years of experience
- 15
- Specialists
- 6
- Disciplines
- 90+
- Projects
What hotel refurbishment includes
The scope ranges from a soft refurbishment of finishes and furniture to a full renovation down to services. It typically covers:
- 01Survey of rooms, bathrooms and public areas
- 02Guest room finishes, joinery, lighting and controls
- 03Bathroom renovation with new waterproofing and fittings
- 04Corridors, lift lobbies and back-of-house areas
- 05Lobby, restaurants, bars and meeting rooms
- 06AC, plumbing and electrical upgrades, fire system modifications
- 07Snagging of each floor before rooms return to service
Hotel refurbishment without closing the hotel
Most hotels in Dubai refurbish while open, especially outside the peak winter season. We agree with the operator which floors and areas are released and when, and set up the work so that guests are not disturbed: noisy work in agreed hours, separate routes for workers and materials through service areas, dust barriers and protection of lifts and corridors.
A mock-up room is usually built first. It lets the operator and the owner approve materials, details and the sequence, and gives an accurate time per room for planning the rest.
Materials and solutions for hotel use
Hotel interiors get heavy daily use. We choose finishes that are durable and easy to maintain: commercial-grade carpets and vinyl, scuff-resistant wall coverings, robust door hardware and joinery that can be repaired. In bathrooms, waterproofing and drainage are rebuilt properly rather than tiled over, because a leak in a hotel affects several rooms at once.
Where a brand standard applies, we follow it for materials, lighting levels, sockets, room controls and accessibility.
Dubai hotel conditions
Hotels run AC around the clock, and humidity problems such as mould behind wallpaper, condensation around fan coil units and musty rooms are common in older properties. Refurbishment is the right moment to fix the cause: insulation of chilled water pipes, fresh air supply and drainage of condensate. Changes to fire alarm and sprinkler systems are designed and approved under Dubai Civil Defence requirements, and works must also respect the classification standards that apply to the property.
What affects cost and timing
The cost of hotel refurbishment depends on the number of rooms and areas, the depth of the scope, the condition of the services, the brand standards and the phasing required by the operator. We give an estimate after the survey and refine it once the mock-up room is approved.
How we run a project
A clear route from the first meeting to handover of the finished building.
- 1
Consultation & site assessment
We discuss the brief, budget and constraints, then survey and measure the site.
- 2
Architectural design
We develop the concept and a full set of project documentation.
- 3
Approvals & permits
We clear the government approvals and obtain the required permits.
- 4
Estimate & planning
We prepare a detailed cost estimate, a work schedule and a delivery plan.
- 5
Construction & handover
We build and supervise on site, then hand over the finished building with full documentation.
Related projects
Questions and answers
Short answers to the questions clients ask most often before a project starts. If yours is not here, write to us and we will advise on your project.
Can hotel refurbishment be done in phases?
Yes, that is the usual approach. Floors or blocks of rooms are released in turn, and public areas are done in stages or at night.
Do you work to another designer's drawings?
Yes. We work with the operator's or owner's interior designer, check the drawings for buildability and develop shop drawings for joinery and details.
What if the building has old services?
We survey the risers, pipework and AC during the room strip-out and propose replacing what is at the end of its life while the rooms are already open.
Why build a mock-up room?
It fixes the materials and details before ordering in quantity and shows the real time needed per room, which makes the whole programme reliable.