Commercial fit-out in Dubai: commercial unit with display racks, a counter and track lighting

Commercial Fit-Out in Dubai

Commercial fit-out in Dubai for offices, shops, restaurants, clinics and showrooms: approvals, MEP, fire systems, finishes and handover under one contract.

Message us on WhatsApp
10+
Years of experience
15
Specialists
6
Disciplines
90+
Projects

Spaces we work with

We carry out fit-out works in different types of commercial premises, both in malls and in standalone or mixed-use buildings.

  1. 01Offices and coworking spaces
  2. 02Retail units in malls and on the street
  3. 03Restaurants, cafes and food outlets
  4. 04Clinics, beauty salons and wellness centres
  5. 05Showrooms and service centres
  6. 06Warehouses with office and customer areas
01

What commercial fit-out includes

The scope depends on the starting point and the business, but a typical project covers:

  • Survey and review of the landlord's fit-out guidelines
  • Working drawings and submissions for landlord NOC and authority approvals
  • Partitions, ceilings, flooring and wall finishes
  • AC, ventilation, plumbing and electrical works
  • Fire alarm, sprinkler and emergency lighting to Dubai Civil Defence rules
  • Shopfront, signage provision, joinery and fixtures
  • Testing, completion inspection and handover
02

Technical points that decide the project

Power capacity is often the first limit. A restaurant kitchen, a clinic with equipment or a retail unit with strong lighting may need more load than the unit has, and an upgrade involves the landlord and DEWA. Drainage is the second: wet areas, grease traps and sinks must connect to points the building can provide.

Air conditioning in commercial spaces is usually connected to the building's chilled water or district cooling system, and any change to fan coil units or ducts goes through the landlord's engineers. Fire systems must be redesigned for the new layout and approved by Dubai Civil Defence.

03

How the work runs

We start with a survey and the landlord's requirements, then agree the design and scope. Drawings go to the landlord and the relevant authority, such as Dubai Municipality, DDA or a free zone authority, and to Civil Defence for fire systems. Once approvals are in place, work proceeds in stages with inspections along the way. At the end we arrange the completion inspection so the business can obtain its trading or operating approvals.

Malls usually set strict rules for working hours, hoarding, deliveries and site safety, and we plan the programme around them.

04

What affects cost and timing

The cost of commercial fit-out depends on the area and type of business, the starting condition of the unit, the scope of MEP and fire works, finishes and joinery, and landlord requirements such as nominated contractors. Approval times are an important part of the schedule. We give an estimate after the survey and a firm figure once the design is fixed.

Process

How we run a project

A clear route from the first meeting to handover of the finished building.

  1. 1

    Consultation & site assessment

    We discuss the brief, budget and constraints, then survey and measure the site.

  2. 2

    Architectural design

    We develop the concept and a full set of project documentation.

  3. 3

    Approvals & permits

    We clear the government approvals and obtain the required permits.

  4. 4

    Estimate & planning

    We prepare a detailed cost estimate, a work schedule and a delivery plan.

  5. 5

    Construction & handover

    We build and supervise on site, then hand over the finished building with full documentation.

Related projects

Questions and answers

Short answers to the questions clients ask most often before a project starts. If yours is not here, write to us and we will advise on your project.

Can you fit out a unit for a specific tenant?

Yes. We can work for the landlord or directly for the tenant, following the tenant's brand requirements and the landlord's fit-out guidelines.

Do I need approval for a separate entrance or new shopfront?

Yes. Changes to the facade or entrances need landlord consent and authority approval. We prepare the drawings and submissions.

How much does a commercial fit-out cost?

It depends on the type of business, area, starting condition and finishes. We give a figure after a survey and a review of the landlord's requirements.

Do you work in malls?

Yes. We work to the mall's fit-out manual, including its rules for working hours, hoarding and inspections.

Every remarkable project begins with a first step

From concept to delivery — we create architecture that unites aesthetics, function and engineering precision.

Message on WhatsApp