Restaurant Fit-Out in Dubai
Restaurant fit-out in Dubai: kitchen, extraction, grease traps, gas, dining room, bar and washrooms, with Dubai Municipality and Civil Defence approvals.
- 10+
- Years of experience
- 15
- Specialists
- 6
- Disciplines
- 90+
- Projects
Kitchen and back of house
The kitchen drives the whole project. Its layout, equipment and services decide the power load, the drainage, the extraction route and the fire system. We build to the kitchen consultant's layout or help develop one around your menu and service flow.
- 01Separation of raw, cooked, washing and storage areas
- 02Hygienic wall and floor finishes with coved junctions and floor drains
- 03Kitchen extract hood, ductwork and fresh air make-up
- 04Hood fire suppression and gas safety shut-off
- 05Grease trap sized and positioned to building and authority rules
- 06Cold rooms, dry stores, staff changing and washrooms
Dining room, bar and guest washrooms
In the front of house the concept matters most, but practical details decide how it performs: acoustic treatment so the room is not too loud, lighting that works by day and night, durable finishes that survive daily cleaning, and service routes that keep staff away from guest tables. Bar counters need water, drainage and power planned in advance. Guest washrooms need accessible provision and good extraction.
How restaurant fit-out runs
We start with the landlord's guidelines and the kitchen and dining concept. Drawings go to the landlord, Dubai Municipality for food establishment approval, and Civil Defence for fire alarm, sprinklers and kitchen suppression. In malls and some communities the landlord also nominates contractors for certain systems, which we coordinate.
On site we sequence the work so that ducts, gas and drainage are complete and tested before ceilings and finishes go in. At the end we support the inspections needed to open.
Restaurants in the Dubai climate
A commercial kitchen in Dubai pulls in large volumes of hot, humid outside air to replace what the hood extracts. Without a properly designed make-up air system and enough cooling, the kitchen overheats and the dining room loses its AC to the kitchen. Outdoor terraces need shading, misting or cooling and finishes that withstand sun and humidity.
What affects cost and timing
The cost of restaurant fit-out depends on the area, the size and type of kitchen, the extraction route and length, the need for a gas installation or power upgrade, the level of finishes and the landlord's requirements. Authority approval times are a key part of the schedule. We give an estimate after the survey and a firm figure once the kitchen and design are fixed.
How we run a project
A clear route from the first meeting to handover of the finished building.
- 1
Consultation & site assessment
We discuss the brief, budget and constraints, then survey and measure the site.
- 2
Architectural design
We develop the concept and a full set of project documentation.
- 3
Approvals & permits
We clear the government approvals and obtain the required permits.
- 4
Estimate & planning
We prepare a detailed cost estimate, a work schedule and a delivery plan.
- 5
Construction & handover
We build and supervise on site, then hand over the finished building with full documentation.
Questions and answers
Short answers to the questions clients ask most often before a project starts. If yours is not here, write to us and we will advise on your project.
Can you fit out a restaurant in an empty unit from scratch?
Yes. Starting from shell and core lets us plan drainage, extraction and power for the kitchen without compromises.
Do you account for Dubai Municipality and Civil Defence requirements?
Yes. The layout and services are designed to meet food safety and fire safety requirements, and we prepare the drawings for approval.
Can the existing extraction be reused?
Sometimes. We check its capacity, condition and route against the new kitchen. If it is undersized or poorly maintained, replacing it is safer.
Can you take over a previous restaurant's fit-out?
Yes. We assess what can be reused, such as the grease trap, ducts and drainage, and what must be replaced to meet the new concept and current rules.
Every remarkable project begins with a first step
From concept to delivery — we create architecture that unites aesthetics, function and engineering precision.