Office fit-out in Dubai: office with workstations, a glass meeting room and timber slats

Office Fit-Out in Dubai

Office fit-out in Dubai: space planning, landlord and authority approvals, partitions, ceilings, AC, lighting, data and fire systems, finishes and handover.

Message us on WhatsApp
10+
Years of experience
15
Specialists
6
Disciplines
90+
Projects

What office fit-out includes

The scope depends on whether you start from shell and core, Cat A or an existing office. A typical Cat B office fit-out covers:

  1. 01Space planning and working drawings
  2. 02Landlord NOC and approvals from DDA, Dubai Municipality or the free zone authority
  3. 03Partitions, glazed meeting rooms and acoustic treatment
  4. 04Ceilings, lighting and power to workstations
  5. 05AC rebalancing and new diffusers to suit the new layout
  6. 06Fire alarm and sprinkler modifications to Dubai Civil Defence rules
  7. 07Data cabling, server room, finishes, joinery and handover
01

Layout and services: what we look at first

When walls are added, the AC, sprinklers and smoke detectors designed for an open floor no longer work as intended. Each new meeting room needs its own supply and return air, sprinkler coverage and detection. We check these early, together with the floor's power capacity and the location of risers, so the layout is buildable and approvable.

Acoustics are another frequent gap. Glass meeting rooms and open ceilings look good but carry sound, so we plan partitions to the slab, acoustic panels and door seals where privacy matters.

02

Office fit-out without stopping your business

If you are refurbishing an occupied office, we split the work into zones and move teams in stages. Noisy and dusty work can be scheduled in the evenings or at weekends where the building allows it. Temporary partitions and protection keep working areas clean, and IT and power changes are coordinated so that people are not left without network access.

03

Dubai office buildings and free zones

Office towers in Dubai each have their own fit-out guidelines: approved working hours, insurance, method statements, use of the loading bay and the building's nominated contractors for fire and BMS works. In free zones such as those under DDA, approvals go through the zone authority. We read the guidelines before pricing, because they directly affect the programme and cost.

At handover we provide the documentation the building and authority require for the completion inspection, including test certificates for fire and electrical systems.

04

What affects cost and timing

The cost of office fit-out depends on the area, the starting condition, the number of enclosed rooms, the level of finishes, the scope of AC and fire modifications, IT requirements and furniture. Approval times and the building's working rules also affect the schedule. We give a firm estimate once the layout is agreed.

Process

How we run a project

A clear route from the first meeting to handover of the finished building.

  1. 1

    Consultation & site assessment

    We discuss the brief, budget and constraints, then survey and measure the site.

  2. 2

    Architectural design

    We develop the concept and a full set of project documentation.

  3. 3

    Approvals & permits

    We clear the government approvals and obtain the required permits.

  4. 4

    Estimate & planning

    We prepare a detailed cost estimate, a work schedule and a delivery plan.

  5. 5

    Construction & handover

    We build and supervise on site, then hand over the finished building with full documentation.

Related projects

Questions and answers

Short answers to the questions clients ask most often before a project starts. If yours is not here, write to us and we will advise on your project.

Can you fit out an office without closing it?

Yes. We phase the work by zones, schedule noisy tasks outside working hours where the building allows and keep working areas protected.

Do I need drawings for an office fit-out?

Yes. The landlord and authority approve the fit-out based on drawings, especially for partitions, AC and fire systems. We prepare or coordinate them.

Do you work in rented offices?

Yes. Most offices in Dubai are leased, and we work to the landlord's fit-out guidelines and agree reinstatement conditions at the start.

Can you build to our designer's concept?

Yes. We review the design for buildability and approvals and develop the working drawings needed for the build.

Every remarkable project begins with a first step

From concept to delivery — we create architecture that unites aesthetics, function and engineering precision.

Message on WhatsApp