How Much Does a Building Inspection Cost?

ZeroMax Group

How much does a building inspection cost? A building inspection in Tashkent ranges from 2 million UZS for a small property to 100–150 million UZS for a full instrumental inspection of a nine-story building. A technical report for an apartment renovation starts at 4 million UZS. Companies rarely publish fixed per-square-meter price lists: the price is calculated after a site visit, because it depends on the size of the building, the purpose, and the number of tests. Below are prices from listings, laboratory price sheets, and official data as of November 2026. Some laboratories quote in US dollars; the amounts have been converted at the Central Bank rate as of November 11 — 11,974 UZS per dollar — and rounded.

Inspection Prices by Type of Work

What you needCost
Technical report for an apartment renovationfrom 4 million UZS (~$330)
Technical report for converting a residential unit to non-residentialfrom 4 million UZS (~$330)
Building inspection: foundation, facade, walls, floors, staircasesfrom 2 million UZS (~$170)
Thermal imaging inspection of an apartment, house, or buildingfrom 550,000 UZS (~$46)
Instrumental inspection of a nine-story residential building100–150 million UZS ($8,400–12,500)

The lower prices are starting amounts from listings. The final figure depends on the area, the condition of the building, and how many tests are required. The cost of inspecting a nine-story building was cited by a representative of the Cabinet of Ministers during discussions of a draft law in January 2026. This is a benchmark for a large multi-apartment building with a full set of tests.

Prices for Tests and Measurements

An instrumental inspection consists of individual tests. These are carried out by a construction laboratory directly on site. The prices below are taken from a Tashkent laboratory's price list for 2026.

TestPrice per unit
Concrete strength by sclerometer, 1 point$5 (~60,000 UZS)
Concrete strength by ultrasonic testing, 1 point$5 (~60,000 UZS)
Concrete strength by pull-out test, 1 test$25 (~300,000 UZS)
Rebar detection and cover thickness, 1 section$13 (~155,000 UZS)
Control core sampling of concrete 200x200 mm$50 (~600,000 UZS)
Crack depth and width by ultrasonic testing, 1 linear meter$30 (~360,000 UZS)
Plaster adhesion to substrate, 1 test$10 (~120,000 UZS)
Anchor pull-out test up to 5 tons, 1 test$70–90 (~840,000–1.1 million UZS)
Soil testing with a plate load testfrom $700 (~8.4 million UZS)
Pile testing with static load up to 50 tonsfrom $4,500 (~54 million UZS)

The sclerometer and ultrasonic testing are the cheapest methods of non-destructive concrete testing; they are used to check many locations. The pull-out test is more accurate and is performed at several points for verification. For example, if a monolithic frame requires 40 sclerometer points, 6 pull-out tests, 10 sections with rebar detection, and 2 core samples, the tests alone will cost approximately $580, or 6.9 million UZS. Engineering work, calculations, and the report are billed separately.

What the Price Consists Of

In February 2026, the Construction Inspection Agency put forward a draft for a unified procedure for calculating inspection costs. Under it, the cost is based on the building volume, time required, adjustment coefficients, and hourly rate. The document is still a draft, but private companies calculate in a similar way. The price increases with:

  • Building size. The more floors and structures, the more measurement and test points are needed.
  • Purpose of the inspection. For an apartment renovation, several walls and floors are checked. For an additional floor, you need to know whether the foundation and walls can withstand the new load, which requires test pits, tests, and calculations.
  • No design documentation. In this case, engineers perform measurements and a detailed instrumental inspection, not just a visual survey.
  • Foundation. To inspect the foundation, test pits are dug down to the footing. Sometimes geotechnical investigations are also required, starting at 800,000 UZS.
  • Seismicity. Tashkent is in a zone of 8–9 points. Therefore, the report also assesses the seismic resistance of the building, which requires additional calculations.
  • Access to structures. If walls are covered with finishes and the basement or attic is locked, the work takes longer.
Reducing the cost of a building inspection: plan, house model, calculator, and coins on a table — how much a building inspection costs without compromising quality.

Visual vs. Instrumental Inspection

An inspection is carried out in two stages, and this is the main difference in price.

  • Visual inspection. An engineer examines the building, records cracks, deflections, dampness, and makes a preliminary assessment of the condition. This is cheaper and faster.
  • Instrumental, or detailed, inspection. This adds measurements, concrete and rebar testing, core sampling, and verification calculations to the visual survey. According to ShNK 1.04.01-23, it is required if defects reduce the load-bearing capacity or if there is no design documentation.

For simple tasks, a visual inspection may be sufficient. If the engineer finds serious defects, an instrumental inspection is prescribed as the next step.

When an Inspection Is Mandatory

Under ShNK 1.04.01-23, an inspection is required if:

  • the building is being expanded upward, modernized, or renovated with increased loads;
  • reconstruction or major repairs are planned;
  • there is no design or working documentation;
  • the building's use is changing;
  • there has been a fire, earthquake, flood, or accident;
  • the service life of structures has expired.

For converting residential premises to non-residential and non-residential to residential, the administrative regulation requires a positive conclusion on the technical condition of the building. If a renovation was done without approval, it will have to be legalized or the apartment returned to its original state, and a technical report will be needed for that. There is also a ban: according to the Presidential Decree of June 4, 2026, renovations in multi-apartment buildings older than 50 years are prohibited, except for structural strengthening work.

What You Get After the Inspection

The result of the inspection is a technical report with a signature and seal. It describes the condition of each structure, defects found and their causes, test results, conclusions, and recommendations. Under ShNK 1.04.01-23, structures are classified into one of four categories:

Condition categoryWhat it means
Normalcan be used without restrictions
Operablecan be used, but monitoring is required
Limited operabilityprotective measures and observation are needed
Emergencythe structure cannot be used

If structures have limited operability, the report specifies what structural strengthening is required. An apartment report for renovation additionally includes drawings before and after changes and an assessment of seismic resistance and fire safety.

Timelines

Scope of workTimeline
Technical report for an apartmentfrom 5–6 days
Building inspectionfrom 1 to 8 weeks

Timelines increase if laboratory tests, test pits, or measurements without original drawings are required.

Who Pays for the Inspection of a Multi-Apartment Building

According to Cabinet of Ministers Resolution No. 405, multi-apartment buildings undergo visual seismic inspections every 5 years and instrumental inspections every 10 years. Starting in 2026, under the Presidential Decree of December 1, 2025, such inspections are organized by building management bodies, and the costs are covered by the local budget. The conclusion has become mandatory: the building can only be used with a positive conclusion.

Residents do not pay for the inspection of the entire building under these rules. An apartment owner pays only for their own report, for example for a renovation. According to data as of September 2025, 9,579 multi-apartment buildings were inspected nationwide, and 87% of them comply with the standards.

How to Reduce the Cost of an Inspection

  • Find the documents. The building design, technical passport, and cadastral plan reduce the scope of measurements and tests.
  • Define the purpose. A renovation and an additional floor require different scopes of work. If the task is clear, there will be no unnecessary tests.
  • Start with a visual inspection. Order an instrumental inspection only if the engineer finds serious defects.
  • Prepare access. Open the basement, attic, and technical rooms; coordinate with neighbors if access to their apartment is needed.
  • Order the inspection and design from one company. Then measurements and test data go directly into the renovation design or strengthening design, and you won't have to pay for them twice.

What to Check Before Ordering

  • What is included in the price. Site visit, tests, core sampling and their patching, calculations, number of copies of the report.
  • Which methods will be used and how many test points are planned.
  • Which standards the report will follow. It must reference ShNK 1.04.01-23.
  • Who signs the report. Ask for a license or other permits and examples of reports for similar buildings.
  • Timelines by stage and what happens if additional tests are needed.
  • A fixed price in the contract. Without it, the amount may increase after the site visit.

If after the inspection you need a strengthening, renovation, or reconstruction design, it is more convenient to order everything from one team, for example at ZeroMax Group. The engineers who inspected the structures prepare the design based on that data. Compare proposals not by the starting price but by the scope of work: a cheap inspection without tests may not be suitable for approval.