Construction surveying tasks on site

The surveyor is involved at every key stage of the works.

  1. 01Setting out plot boundaries and the building grid
  2. 02Transferring levels and establishing site benchmarks
  3. 03Setting out excavations and checking earthworks
  4. 04Checking verticality of columns, walls and lift shafts
  5. 05As-built surveys of foundations, frame and utilities
  6. 06Monitoring settlement and movement of buildings
01

Setting out the design on site

Before excavation begins, the surveyor marks the plot corners and checks them against the official plot data, then sets out the building grid and the reference levels. In Dubai, the plot boundary and building position are often verified by the relevant authority or the master developer before construction continues, so accuracy at this stage is essential.

As the work progresses, the grid and levels are transferred to each new floor, and formwork, anchor bolts and embedded items are checked before concrete is poured.

02

As-built records and quality control

After each stage, the surveyor records the actual position and levels of what was built. These as-built surveys show deviations early, while they can still be corrected in the next stage, and form part of the documentation needed for completion.

As-built surveys of underground utilities are especially important, because they cannot be seen after backfilling. Accurate records save time when connections are made or repairs are needed later.

03

Monitoring in dense areas

When excavation and dewatering take place next to existing buildings, roads or services, their movement is monitored. Survey points are installed on neighbouring structures and measured at regular intervals during the works.

If movement approaches the agreed limits, the site team and designers are alerted and can change the method of work before damage occurs. On reclaimed land and soft soils, settlement of the new building itself may also be monitored.

04

What affects cost and schedule

The scope depends on the size and height of the building, the number of setting-out and checking visits, the need for monitoring and its frequency, and the format of the as-built documentation required.

05

Construction surveying within a full project

When surveying, design and construction are coordinated by one team, the surveyor works from the latest drawings and questions on site are resolved quickly with the designers. Survey data also feeds back into the as-built drawings at the end of the project.

Process

How we run a project

A clear route from the first meeting to handover of the finished building.

  1. 1

    Consultation & site assessment

    We discuss the brief, budget and constraints, then survey and measure the site.

  2. 2

    Architectural design

    We develop the concept and a full set of project documentation.

  3. 3

    Approvals & permits

    We clear the government approvals and obtain the required permits.

  4. 4

    Estimate & planning

    We prepare a detailed cost estimate, a work schedule and a delivery plan.

  5. 5

    Construction & handover

    We build and supervise on site, then hand over the finished building with full documentation.

Questions and answers

Short answers to the questions clients ask most often before a project starts. If yours is not here, write to us and we will advise on your project.

Does a villa project need a surveyor?

Yes. Even on a small site, the building must be set out accurately within the plot and setbacks, and levels must match the design and the neighbouring plots.

How is construction surveying different from a topographic survey?

A topographic survey records the site before design. Construction surveying transfers the design onto the ground and checks the work during construction.

What is an as-built survey?

It is a record of the actual position and levels of built elements, compared with the design, used for quality control and completion documents.

Can neighbouring buildings be monitored during excavation?

Yes. Monitoring points are installed and measured at agreed intervals, so any movement is noticed early.