
Cost estimation and BOQ in Dubai
Cost estimation and BOQ in Dubai: bills of quantities, construction cost estimates, budget checks and review of contractor pricing for new builds and fit-outs.
- 10+
- Years of experience
- 15
- Specialists
- 6
- Disciplines
- 90+
- Projects
What we prepare
The format depends on the stage of the project and on what the client will use the document for: a feasibility budget, a tender or a check of a contractor's price.
- 01Preliminary cost estimates at concept stage
- 02Detailed bills of quantities by trade: civil, structural, MEP, finishes
- 03Elemental cost plans for a whole building
- 04Material take-offs and specifications
- 05Estimates for renovation and fit-out works based on a site survey
- 06Review and comparison of contractor BOQs and offers
How cost estimation and BOQ work is done
The estimator studies the drawings and specifications, clarifies open questions with the designers and lists every item of work with its unit and quantity. Quantities are measured directly from the drawings or the model, and each item gets a clear description so that contractors price the same thing.
Rates are then applied based on current market prices for labour, materials and equipment in Dubai. The result is a BOQ and a cost summary that show where the money goes and which items carry the largest share. If the design is still changing, the estimate is updated at each stage.
Why an independent estimate helps the client
Contractors prepare their own pricing, but every contractor measures and describes the work differently. A BOQ prepared by the client's side gives all bidders the same list, so offers can be compared line by line instead of by the total figure alone.
An independent estimate also shows whether a price is realistic. A quote far below the estimate often means missing items that will appear later as variations, and a quote far above it points to items worth discussing.
Estimates for projects in Dubai
Construction costs in Dubai depend strongly on the specification. MEP systems, especially air conditioning, often take a large share of the budget. Façade systems, waterproofing, dewatering on sites with high groundwater, authority fees and utility connections also need their own lines so they are not missed.
For villas and fit-outs in master-planned communities, the estimate also accounts for developer requirements, NOC conditions and working-hour restrictions, which affect how the work is organised and priced.
What affects the timeline and cost of an estimate
The work depends on the size of the project, the completeness of the drawings, the number of trades, and the level of detail needed. A concept budget can be based on areas and benchmarks, while a tender BOQ requires a full set of drawings and specifications.
How we run a project
A clear route from the first meeting to handover of the finished building.
- 1
Consultation & site assessment
We discuss the brief, budget and constraints, then survey and measure the site.
- 2
Architectural design
We develop the concept and a full set of project documentation.
- 3
Approvals & permits
We clear the government approvals and obtain the required permits.
- 4
Estimate & planning
We prepare a detailed cost estimate, a work schedule and a delivery plan.
- 5
Construction & handover
We build and supervise on site, then hand over the finished building with full documentation.
Questions and answers
Short answers to the questions clients ask most often before a project starts. If yours is not here, write to us and we will advise on your project.
Can you prepare an estimate without full drawings?
A preliminary budget can be prepared from a concept design or a description of the project. It gives an order of magnitude, and it is refined as the drawings develop.
Do you check BOQs prepared by contractors?
Yes. We compare quantities with the drawings, check descriptions and rates, and point out missing or duplicated items.
When should an estimate be updated?
When the design changes significantly, when the specification of materials changes, or when a long time passes between the estimate and the start of works.
Is the BOQ suitable for tendering?
Yes. A BOQ prepared from complete drawings is the usual basis for inviting contractors to price the same scope.
Every remarkable project begins with a first step
From concept to delivery — we create architecture that unites aesthetics, function and engineering precision.
