Typical stages of work

The scope depends on your goals, but a typical new home renovation includes:

  1. 01Snagging inspection and defect list for the developer
  2. 02Design of the upgrades and drawings for the NOC
  3. 03Selective removal of finishes you want to replace
  4. 04Electrical and lighting changes, extra sockets and data points
  5. 05New flooring, wall finishes, gypsum ceilings or feature walls
  6. 06Built-in wardrobes, kitchen upgrades and joinery, final cleaning and handover
01

Where new home renovation starts

The first step is a snagging inspection. We check walls, floors, tiling, doors, windows, AC performance, drainage falls and electrical points, and record defects with photos so you can submit them to the developer within the defects period. Items the developer must fix should be fixed before renovation begins, otherwise it becomes hard to say who is responsible.

We then agree what to keep and what to change. In many new units the tiles, sanitaryware and AC are in good condition, and the budget is better spent on joinery, lighting, flooring and layout.

02

What to know about new buildings

New towers and communities come with their own rules. A renovation NOC from the developer or building management is required, and during the first months after handover many units are being fitted out at once, so lifts, loading bays and working hours are shared. Changes to walls, wet areas, facade elements or fire-safety items such as sprinklers and smoke detectors need approval and must follow Dubai Civil Defence requirements.

Keep in mind that altering developer-installed systems may affect their defects liability, so we document what was there and what was changed.

03

If you bought a shell and core or unfinished unit

Some villas and commercial units are handed over without finishes. In that case the work is closer to a full fit-out: services, screeds, plaster, waterproofing and all finishes. We plan it as one project so the services are laid out to the final design and do not need to be moved later.

04

What affects cost and timing

The cost of new home renovation depends on the size of the unit, how much of the developer finish you keep, layout changes, the volume of joinery and the chosen materials. Timing is also affected by NOC approval and by building access when many neighbours are fitting out at the same time. We give an estimate and schedule after the inspection.

Process

How we run a project

A clear route from the first meeting to handover of the finished building.

  1. 1

    Consultation & site assessment

    We discuss the brief, budget and constraints, then survey and measure the site.

  2. 2

    Architectural design

    We develop the concept and a full set of project documentation.

  3. 3

    Approvals & permits

    We clear the government approvals and obtain the required permits.

  4. 4

    Estimate & planning

    We prepare a detailed cost estimate, a work schedule and a delivery plan.

  5. 5

    Construction & handover

    We build and supervise on site, then hand over the finished building with full documentation.

Questions and answers

Short answers to the questions clients ask most often before a project starts. If yours is not here, write to us and we will advise on your project.

When can I start renovating after handover?

Once you have the keys and the renovation NOC. It is best to submit snags to the developer first and let them close the defects before work starts.

Will renovation affect the developer's defects liability?

It can for the elements you change. We record the original condition and limit changes to what you actually want, so the remaining items stay covered.

Can I move the kitchen or a bathroom in a new apartment?

Sometimes. It depends on the drainage risers and the building's rules, and it needs approval. We check the drawings and advise before you commit.

Is it worth replacing finishes in a brand-new unit?

Only where they do not suit you. Many owners keep the developer's tiles and sanitaryware and invest in joinery, lighting and flooring, which change the feel of the home the most.