Complete home renovation in Dubai: walls stripped back as workers plaster and fit the ceiling

Complete Home Renovation in Dubai

Complete home renovation in Dubai: full strip-out, replacement of electrical, plumbing and AC, waterproofing, layout changes and new finishes.

Message us on WhatsApp
10+
Years of experience
15
Specialists
6
Disciplines
90+
Projects

When a complete renovation is needed

A complete renovation makes sense when the condition of the property shows the services and finishes are at the end of their life. Typical signs:

  1. 01Repeated leaks, damp patches or smells from drains
  2. 02AC units that struggle in summer and condensation on ceilings
  3. 03Tripping breakers, warm sockets or outdated distribution boards
  4. 04Cracked or hollow-sounding tiles and loose flooring
  5. 05Rusty pipes and low water pressure
  6. 06A layout that no longer works for the household
01

What a complete renovation includes

The exact scope depends on the survey, but usually covers:

  • Strip-out down to the structure and removal of debris
  • New electrical installation and distribution board
  • New water supply and drainage pipework
  • AC replacement or redesign, with new ducts and insulation
  • Waterproofing of bathrooms, kitchens and balconies
  • Screeds, plaster, gypsum ceilings and all new finishes
02

Older Dubai properties: what we look out for

In buildings and villas from the early 2000s we often find galvanised pipes with corrosion, AC drain lines with poor falls, failed waterproofing under tiles and wiring that was not designed for today's appliances. Near the coast, salt air adds corrosion of metal parts and outdoor units. We open up suspect areas early to see what is behind the finishes before fixing the scope.

Changes to walls, wet areas or fire-safety systems need a renovation NOC from the building or master developer, and in some cases approval from Dubai Municipality, Trakhees or DDA and compliance with Dubai Civil Defence rules. We prepare the drawings for these applications.

03

How we organise the work

After the survey we prepare a scope and estimate, agree the stages and sign-off points, and apply for approvals. Work then follows the technical order: strip-out, first-fix services, waterproofing with a flood test, screeds and plaster, then finishes. Hidden work is shown to you before it is closed up and recorded in photos.

04

What affects the cost

The cost of complete home renovation depends on the size of the property, the condition of the structure and services, how much is replaced, any layout changes and the level of finishes. A villa also brings the roof and external areas into scope. We give a firm estimate after the survey.

Process

How we run a project

A clear route from the first meeting to handover of the finished building.

  1. 1

    Consultation & site assessment

    We discuss the brief, budget and constraints, then survey and measure the site.

  2. 2

    Architectural design

    We develop the concept and a full set of project documentation.

  3. 3

    Approvals & permits

    We clear the government approvals and obtain the required permits.

  4. 4

    Estimate & planning

    We prepare a detailed cost estimate, a work schedule and a delivery plan.

  5. 5

    Construction & handover

    We build and supervise on site, then hand over the finished building with full documentation.

Questions and answers

Short answers to the questions clients ask most often before a project starts. If yours is not here, write to us and we will advise on your project.

How is a complete renovation different from a cosmetic one?

A cosmetic renovation updates surfaces such as paint and flooring. A complete renovation replaces the services and finishes down to the structure.

Do I need approval for a complete renovation?

Yes, most buildings and communities require a renovation NOC, and layout or fire-safety changes may need authority approval. We handle the drawings and the submission.

Can I live in the property during the works?

Not realistically. Water, power and AC will be off for periods and there is a lot of dust. Plan to move out for the duration of the works.

Can a complete renovation be done one room at a time?

Finishes can be phased, but services such as wiring and pipework are best replaced in one go so the system works as a whole.

Every remarkable project begins with a first step

From concept to delivery — we create architecture that unites aesthetics, function and engineering precision.

Message on WhatsApp