
Turnkey Apartment Renovation in Dubai
Apartment renovation in Dubai, turnkey: site survey, building NOC, demolition, MEP upgrades, finishing and handover, run by one team from start to finish.
- 10+
- Years of experience
- 15
- Specialists
- 6
- Disciplines
- 90+
- Projects
What turnkey apartment renovation includes
We define the scope after inspecting the unit. In one apartment it is enough to replace flooring, repaint and update the kitchen. In another, a ten or fifteen year old unit needs new bathrooms, rewiring, new AC units and a reworked layout. So we price apartment renovation according to the actual condition of the space, not a template.
- 01Site visit, measurements and a record of the existing condition
- 02Layout options and working drawings for the site team
- 03Building management NOC and any required authority approvals
- 04Demolition and removal of debris through the building's approved route
- 05Electrical, plumbing and AC upgrades
- 06Wall preparation, flooring, joinery, sanitaryware and lighting
- 07Snagging, deep cleaning and handover
Working inside a Dubai residential tower
An apartment is part of a managed building, and that shapes how the work is organised. Most towers require a renovation NOC from the building management or owners association before work starts, often with a refundable deposit, contractor documents and insurance. Noisy work is limited to permitted hours, materials go up in the service lift, and debris leaves by the route the building allows.
If you want to move walls, open the kitchen or relocate a bathroom, we first check what is structural and where the risers and drainage run. Some changes need approval from the master developer or the relevant authority, such as Dubai Municipality, Trakhees or DDA depending on the community. Changes to sprinklers, smoke detectors or fire alarm points must follow Dubai Civil Defence rules and are coordinated with the building's fire contractor.
How the work runs
After the survey we prepare an estimate listing works and materials. Once it is agreed, we sign a contract that sets out the stages and the sign-off procedure.
Work then follows the technical sequence: strip-out, first-fix services, walls and floors, then finishes. Hidden work such as wiring, pipework and bathroom waterproofing is shown to you before it is closed up and recorded in photos. When one team handles the whole apartment renovation, you know exactly what is inside the walls and who is responsible for it.
Materials and the Dubai climate
Materials are bought to the agreed estimate or chosen together with you. Our engineers check wall flatness, floor levels, falls in shower areas and the routing of services.
Heat and humidity are the main stress factors in Dubai apartments. We pay attention to AC drain lines and condensation, insulation of chilled water pipes in fan coil units, and moisture-resistant boards and finishes in wet areas. Where the AC layout changes, ducts and access panels are planned before the ceilings are closed, so there is no need to cut into finished surfaces later.
What affects cost and timing
The cost of apartment renovation depends on the size and condition of the unit, the amount of demolition, how much of the MEP needs replacing, the complexity of the finishes and the materials you choose. Layout changes and building rules also play a part: approval times, permitted working hours and access for deliveries. We give a firm estimate and schedule after the site visit.
How we run a project
A clear route from the first meeting to handover of the finished building.
- 1
Consultation & site assessment
We discuss the brief, budget and constraints, then survey and measure the site.
- 2
Architectural design
We develop the concept and a full set of project documentation.
- 3
Approvals & permits
We clear the government approvals and obtain the required permits.
- 4
Estimate & planning
We prepare a detailed cost estimate, a work schedule and a delivery plan.
- 5
Construction & handover
We build and supervise on site, then hand over the finished building with full documentation.
Questions and answers
Short answers to the questions clients ask most often before a project starts. If yours is not here, write to us and we will advise on your project.
Can I live in the apartment during renovation?
During a full renovation it is uncomfortable and unsafe because of dust and shut-offs of water and power. If only part of the apartment is being renovated, the work can be split into zones and the order agreed in advance.
Do I need building approval to renovate my apartment?
Almost every Dubai tower requires a renovation NOC from the building management, and some changes also need developer or authority approval. We prepare the drawings and documents for these applications as part of the job.
Do I need an interior design before turnkey renovation?
A layout and working drawings are enough for the renovation itself. If you want a fully designed interior with selected furniture and decor, it is better to start with an interior design package.
How can I check the work that gets covered by finishes?
Wiring, pipework and waterproofing are shown to you before they are closed and recorded in photos. You sign them off separately before finishing starts.
Every remarkable project begins with a first step
From concept to delivery — we create architecture that unites aesthetics, function and engineering precision.
