What the construction logistics plan includes

The content is adapted to the size of the project and the constraints of the site.

  1. 01Site layout plan with crane, storage, site offices and temporary roads
  2. 02Phasing and an outline programme of the main stages
  3. 03Sequence of the main construction activities
  4. 04Estimate of labour, plant, power and water needs
  5. 05Temporary utilities for the construction period
  6. 06Health and safety, fire safety and environmental measures
  7. 07Protection of neighbouring buildings and underground services
01

Why the client needs it

The plan turns the design into a realistic sequence of work. It shows early whether the plot has enough space for a crane and materials, whether deliveries need to happen at night, and how long each stage is likely to take. This helps the client compare contractor proposals and plan financing.

Many of the permits a contractor needs in Dubai, such as for hoarding, road closures, cranes or temporary connections, rely on the same information, so a prepared plan saves time later.

02

Building on a tight plot in Dubai

In established areas and inside communities, plots are often surrounded by occupied buildings and busy roads. Deliveries, crane swing over neighbouring properties, dust and noise have to be planned carefully. Master developers and authorities set rules for working hours, site hoarding and vehicle access.

Deep excavations next to existing buildings and roads require shoring and dewatering plans, as well as monitoring of neighbouring structures during the works.

03

Heat and concrete works

Dubai summers affect the whole construction process. The plan accounts for the midday break rules for outdoor work in summer, shaded rest areas and drinking water for workers. Concrete pours in hot weather need measures such as night pours, chilled water or ice in the mix, and proper curing to avoid cracking.

Sand and wind also affect cranes and work at height, which is reflected in the safety measures.

04

Logistics plan and method statements

The construction logistics plan is prepared by the designer at the design stage and sets the overall approach. Detailed method statements for specific activities, such as excavation, formwork or crane lifts, are prepared by the contractor before the works, based on the logistics plan and their own equipment.

Process

How we run a project

A clear route from the first meeting to handover of the finished building.

  1. 1

    Consultation & site assessment

    We discuss the brief, budget and constraints, then survey and measure the site.

  2. 2

    Architectural design

    We develop the concept and a full set of project documentation.

  3. 3

    Approvals & permits

    We clear the government approvals and obtain the required permits.

  4. 4

    Estimate & planning

    We prepare a detailed cost estimate, a work schedule and a delivery plan.

  5. 5

    Construction & handover

    We build and supervise on site, then hand over the finished building with full documentation.

Questions and answers

Short answers to the questions clients ask most often before a project starts. If yours is not here, write to us and we will advise on your project.

Is a construction logistics plan mandatory?

Requirements vary by project and authority, but for most medium and large projects, and for any work on tight plots, a logistics plan is either required or strongly advisable.

Can you prepare only the logistics plan if another consultant did the design?

Yes. The engineers review the approved design, visit the site and prepare the plan based on that information.

Do you take neighbouring buildings into account?

Yes. The plan includes protection measures for neighbouring structures and services, and monitoring where excavation is close to them.

Does the plan include a construction programme?

It includes an outline programme of the main stages. The contractor develops the detailed programme for the works.