Foundation design in Dubai: foundation slab with rebar starter bars in the excavation, drawings and a hard hat

Foundation design in Dubai

Foundation design in Dubai: raft, isolated and pile foundations based on the soil report, settlement checks, waterproofing and protection from aggressive soils.

Message us on WhatsApp
10+
Years of experience
15
Specialists
6
Disciplines
90+
Projects

What foundation design includes

The design is based on the geotechnical report and the structural model of the building.

  1. 01Review of the geotechnical investigation for the plot
  2. 02Selection of the foundation type and founding level
  3. 03Bearing capacity and settlement calculations
  4. 04Plans, sections and reinforcement drawings
  5. 05Waterproofing, protection and dewatering requirements
  6. 06Details of basement walls, service entries and ground slabs
01

Types of foundations

Isolated and strip footings suit light buildings on firm ground. A raft spreads the load over the whole footprint and is often used for villas and mid-rise buildings with basements or where the ground is uneven. Piles carry the load down to stronger layers and are used for taller buildings or where the upper soil is weak.

The choice is made on the basis of calculations and the soil report, not by habit. Sometimes a combination is the most economical answer, for example a raft on piles under a tower and a simple raft under a podium.

02

Foundation design for Dubai soils

Ground conditions in Dubai vary a lot. Inland plots are often on dense sand and weak rock, while coastal and reclaimed areas may have loose sand, high groundwater and sabkha, a salt-crusted soil that loses strength when wet. Each of these needs a different approach to bearing capacity, settlement and excavation.

Groundwater and soil near the coast are rich in chlorides and sulfates, which attack concrete and reinforcement. The design specifies sulfate-resisting concrete, adequate cover, protective membranes and waterproofing for basements. Where excavation goes below the water table, dewatering and shoring requirements are set out for the contractor. Foundations are designed to the Dubai Building Code and the requirements of the relevant authority.

03

Foundations on tight urban plots

On plots surrounded by existing buildings, the foundation design has to consider the neighbours. Excavation and dewatering can affect adjacent foundations, so shoring systems, the sequence of excavation and monitoring are planned in advance.

For extensions and additional floors on existing buildings, the existing foundations are checked first. If they cannot take the additional load, the design includes strengthening.

04

Input data and scope

Foundation design needs a geotechnical report, a topographic survey and the loads from the structural model. The scope depends on the building size, the foundation type, the depth of excavation and the groundwater level.

Process

How we run a project

A clear route from the first meeting to handover of the finished building.

  1. 1

    Consultation & site assessment

    We discuss the brief, budget and constraints, then survey and measure the site.

  2. 2

    Architectural design

    We develop the concept and a full set of project documentation.

  3. 3

    Approvals & permits

    We clear the government approvals and obtain the required permits.

  4. 4

    Estimate & planning

    We prepare a detailed cost estimate, a work schedule and a delivery plan.

  5. 5

    Construction & handover

    We build and supervise on site, then hand over the finished building with full documentation.

Questions and answers

Short answers to the questions clients ask most often before a project starts. If yours is not here, write to us and we will advise on your project.

Can a foundation be designed without a soil investigation?

Not reliably. Without data on the soil, the engineer has to assume conservative values, which either increases cost or adds risk. Authorities in Dubai also require a soil report for permit drawings.

Which foundation is best for a villa?

It depends on the soil and the villa design. Isolated footings with tie beams or a raft are common, but the choice follows the soil report and calculation.

How is a foundation protected from salty groundwater?

Through the right concrete mix and cement type, sufficient cover to reinforcement, waterproofing membranes and protection boards, all specified in the design.

Can the foundation of an existing building be strengthened?

Yes, after an investigation of the existing foundation and soil. Options include enlarging footings, adding micropiles or other measures depending on the situation.

Every remarkable project begins with a first step

From concept to delivery — we create architecture that unites aesthetics, function and engineering precision.

Message on WhatsApp