Building renovation design in Dubai: building in scaffolding during renovation, a model on a laptop and drawings

Building renovation design in Dubai

Building renovation design in Dubai: condition survey, as-built drawings, new layouts, structural strengthening and MEP upgrades for authority approval.

Message us on WhatsApp
10+
Years of experience
15
Specialists
6
Disciplines
90+
Projects

When renovation design is needed

A design is needed whenever the work goes beyond cosmetic finishes.

  1. 01Change of use, for example residential to office or retail
  2. 02Adding floors or extensions
  3. 03Converting a warehouse, workshop or office building
  4. 04Merging or dividing units with changes to structural walls
  5. 05Replacing worn slabs, roofs or building services
  6. 06Facade upgrades that change its construction
01

The condition survey comes first

Existing drawings of older buildings are often incomplete or do not match what was built. The engineers measure the building, open up selected areas, and test concrete strength and reinforcement where needed. In Dubai, special attention goes to corrosion of reinforcement from chlorides, cracks from thermal movement and water damage at roofs and wet areas.

The survey report states what can be kept, what must be repaired and what limits the new design. It is the basis for every decision that follows.

02

What building renovation design includes

The package combines the survey with the design of all changes.

  • Condition survey report
  • As-built drawings of the existing building
  • Architectural design of new layouts and facades
  • Strengthening of foundations, columns, walls and slabs
  • MEP systems for the new use and loads
  • Cost estimate for the renovation
03

Renovation in Dubai: approvals and constraints

Renovation works that affect the structure, the use, the facade or the building services require approval from the relevant authority, which may be Dubai Municipality, Trakhees or Dubai Development Authority depending on the location. In communities with a master developer, a developer NOC is usually needed as well. Changes to the electrical load or water supply require coordination with DEWA, and changes affecting fire safety go to Dubai Civil Defence.

Renovation of occupied buildings also has to consider neighbours, working hours, noise and access, which affect how the works are phased.

04

What affects cost and timeline

The scope depends on the size and age of the building, the availability of original drawings, the condition of the structure, the extent of changes and the number of systems to be upgraded. A clearer estimate can be given after a site visit.

Process

How we run a project

A clear route from the first meeting to handover of the finished building.

  1. 1

    Consultation & site assessment

    We discuss the brief, budget and constraints, then survey and measure the site.

  2. 2

    Architectural design

    We develop the concept and a full set of project documentation.

  3. 3

    Approvals & permits

    We clear the government approvals and obtain the required permits.

  4. 4

    Estimate & planning

    We prepare a detailed cost estimate, a work schedule and a delivery plan.

  5. 5

    Construction & handover

    We build and supervise on site, then hand over the finished building with full documentation.

Related projects

Questions and answers

Short answers to the questions clients ask most often before a project starts. If yours is not here, write to us and we will advise on your project.

Can a renovation be designed without the original drawings?

Yes. The engineers carry out a measured survey and prepare as-built drawings, and the structural survey determines the capacity of the existing elements.

Is a design needed for a change of use?

Yes. A change of use normally changes loads, fire safety and service requirements, and it needs authority approval based on drawings.

Do you check the strength of existing structures?

Yes. The condition survey includes inspection and, where needed, testing of concrete and reinforcement, followed by structural calculations.

Can a building stay in use during renovation?

Often it can, if the works are phased. The design and the construction plan define which areas are closed at each stage.

Every remarkable project begins with a first step

From concept to delivery — we create architecture that unites aesthetics, function and engineering precision.

Message on WhatsApp