SupervisionHow Much Do Technical and Author's Supervision Cost?
How much do technical and author's supervision cost? A designer's author's supervision during apartment renovation in Tashkent ranges from 1 million UZS to $300 per month, or about $15 per m² for three months of renovation. A one-time visit by a technical supervision engineer starts at 500,000 UZS. For private houses, a separate rule has been in effect since 2026: private construction control costs the same as the house's design documentation. Below are prices from Tashkent studios and engineers, legal norms, and payment formats as of November 2026. Amounts are converted at the Central Bank rate as of November 11 — 11,974 UZS per dollar — and rounded.
How technical and author's supervision differ
Technical supervision is carried out by an engineer on the client's side. They check the contractor: the quality of work and materials, volumes, concealed works, compliance with the design and regulations. Author's supervision is carried out by the project author, designer, or architect. They ensure the crew does everything according to the drawings, answer the craftsmen's questions, and adjust the design if necessary.
According to the Town Planning Code, there are four types of control on a construction site, including technical and author's supervision. Without their conclusions, a permit to operate the building is not issued. We covered how author's supervision works in Uzbekistan separately.
Technical supervision prices
| Service | Price |
|---|---|
| One-time engineer visit to the site: acceptance of a stage, foundation, walls, roof | from 500,000 UZS (~$42) |
| Estimate review or consultation | from 150,000 UZS (~$13) |
| Concealed works certificate based on client data | from 250,000 UZS (~$21) |
| Technical supervision with full construction support: crew selection, material calculations | 200,000 UZS per m² (~$17) |
| Salary of an in-house technical supervision engineer, net | 15–18 million UZS per month |
Companies in Tashkent rarely publish a monthly technical supervision rate: ads say “negotiable” and the price is calculated after getting acquainted with the site. That is why the table shows prices for individual services. An in-house engineer's salary is a benchmark for large sites where technical supervision is needed every day. For apartment renovation, technical supervision for renovation with visits at key stages is usually sufficient.
Author's supervision prices
| Format | Price |
|---|---|
| Designer's author's supervision, monthly | from 1 million UZS to $300 per month |
| Author's support of renovation from 150 m², for 3 months | $15 per m² (~180,000 UZS) |
| Same remotely | $10 per m² (~120,000 UZS) |
| Supervision as part of a design project | $20–25 per m² of the project |
The lower bound of 1 million UZS per month is cited by the craftsmen's marketplace, while design studios charge $300 per month. Some studios do not charge for the first month of supervision. In the last row, supervision is not sold separately: it is included in the higher packages of the design project along with layout, 3D, and drawings. In one such package at $20 per m², the designer visits the site 4 times a month from start to finish of the renovation.

Rules for private houses and publicly funded projects
- Private house. Since April 13, 2026, under Cabinet of Ministers Resolution No. 167, for houses up to 2 storeys, up to 12 m, and up to 500 m², private construction control applies instead of author's supervision. It is carried out by a licensed designer. The cost of control equals the cost of the house's design documentation: if the house design costs $3,000, the control also costs $3,000. Inspections are carried out at least once a month.
- Publicly funded projects. Since January 24, 2027, under Cabinet of Ministers Resolution No. 584, author's supervision on projects funded by the budget costs 10% of the design and estimate documentation value. If the project costs 1 billion UZS, supervision costs 100 million UZS. This is 10% of the project, not of the construction cost.
- Calculation procedure. According to the Regulation on the Procedure for Author's and Technical Supervision, the supervision price is calculated based on the complexity of the facility, its hazard category, and the frequency of visits, and is specified in the contract.
Payment formats
| Format | Best for |
|---|---|
| Monthly | Renovation or construction lasting more than 2–3 months |
| Per visit | Checking individual stages, small renovation |
| Per m² for the entire term | Renovation with a clear timeline, usually 3 months |
| As part of a design project | Those ordering both design and supervision from one studio |
| Percentage of the project | Publicly funded projects and private houses under the new rules |
| In-house engineer | Large sites with daily control |
Monthly payment is the most common format. Clarify how many visits are included per month: this affects the real cost of one visit. Payment per visit is advantageous if an engineer is needed only at key stages: acceptance of the foundation, electrical wiring, waterproofing before they are covered by finishes. Payment per m² is convenient because the amount is known in advance. But if the renovation takes longer than the agreed term, further payment is usually monthly.
On large sites, technical supervision is paid as the project progresses. Part of the amount, for example 5%, is withheld until the end of the warranty period. This is how Tashkent banks' construction tenders are handled.
Example calculation for apartment renovation
Suppose a turnkey renovation of an 80 m² apartment takes 4 months, and turnkey renovation costs $200–400 per m², i.e., $16,000–32,000. Supervision will cost approximately $1,500:
- author's supervision — $300 per month, $1,200 for 4 months;
- technical supervision — 2 visits per month at 500,000 UZS each, about 4 million UZS for 4 months, which is $334.
In total, supervision will amount to 5–10% of the renovation budget. A mistake in waterproofing, electrical wiring, or screed that is noticed only after the final finishes usually costs more.
Who can carry out supervision
- Author's supervision. According to the Regulation on Supervision, it is carried out by a designer with specialized education, at least 3 years of experience, and a certificate.
- Technical supervision on complex sites. Since January 1, 2026, on facilities of hazard categories II–IV and on publicly funded projects, it can only be carried out by a specialist with a certificate.
- Register of specialists. Since March 1, 2026, under Presidential Decree PF-236, work is carried out by specialists from the “Shaffof Qurilish” system register.
- Apartment renovation. Supervision is not legally required here. It is ordered to control quality and avoid overpaying for rework.
Author's supervision instructions on a construction site cannot be ignored. Under Article 99 of the Administrative Liability Code, for incomplete compliance with mandatory instructions of the design organization, individuals are fined 40 BCU (basic calculation units), which is 17.6 million UZS, and officials — 70 BCU, or 30.8 million UZS.
What to check in the contract
- Number of visits per month and the price of an additional visit.
- Reports. Photo report after each visit, concealed works certificates, logbook entries.
- Supervision rights. Whether the engineer can stop work and issue instructions to the contractor.
- Specialist's certificate, if the facility falls under a category where it is mandatory.
- What happens if the renovation is delayed. How months beyond the term are paid.
- Estimate review. Whether the price includes review of the estimate and the volumes the contractor submits for payment.
- Independence. It is better to hire technical supervision separately from the contractor: an engineer paid by the crew is unlikely to be strict with it.
If both technical and author's supervision are needed, it is convenient to order them together with the design, for example from ZeroMax Group. Then the project author and the engineer work from the same drawings and do not shift responsibility to each other. Compare offers not by monthly price, but by the number of visits and the reports you will receive.