Contents
How Much Does an Office Renovation Cost in Tashkent?Costs and Investment

How Much Does an Office Renovation Cost in Tashkent?

ZeroMax Group

An office renovation in Tashkent ranges from 190,000 UZS per m² for a basic cosmetic refresh to $650–1,200 per m² for a high-end office fit-out. The price depends on the condition of the space, the office class, and how much engineering work is needed. Most offices in Tashkent are handed over unfinished, so renovation is a standard line item for the tenant. The prices below are based on Tashkent contractors' rate cards, listings, and market reports as of November 2026. The amounts are converted at the Central Bank rate as of November 11 — 11,974 UZS to the dollar — and rounded.

Prices by renovation level

Renovation levelPrice per m²
Cosmetic: painting walls, replacing flooring, minor ceiling repairsfrom 190,000 UZS (~$16)
Major: rewiring, new partitions, leveling wallsfrom 260,000 UZS (~$22)
Turnkey renovation, labor onlyfrom $120–180 (1.4–2.2 million UZS)
High-end office fit-out from a bare shell$650–1,200 (7.8–14.4 million UZS)

The first three rows are contractors' starting prices; the final quote after a site visit is usually higher. A marketplace of tradespeople estimates office renovation in Tashkent in 2026 at 490,000–1,960,000 UZS per m², which works out to $41–164. The last row is CMWP's estimate for high-class offices. It excludes furniture, IT equipment, and VAT.

What a full office renovation costs

Most offices rented in Tashkent are 100–300 m², accounting for 81% of all deals. For these sizes, the budget looks like this:

Office areaTurnkey, labor onlyClass A fit-out
100 m²$12,000–18,000$65,000–120,000
200 m²$24,000–36,000$130,000–240,000
300 m²$36,000–54,000$195,000–360,000

Turnkey renovation usually suits Class B and C offices that already have a screed floor, walls, and basic utilities. A Class A fit-out is needed when the office is handed over as a bare concrete shell with no partitions, ceilings, or engineering. The middle-ground option is a white box fit-out: walls and floors are already leveled, main utilities are run, and the tenant only needs to do the finishing work.

Office finishing prices

Work or materialPrice
Drywall partition, laborfrom 70,000 UZS per m² (~$6)
Tempered glass office partition$50–55 per m²
Armstrong-style 600x600 suspended ceiling tilesfrom 20,000 UZS per m²
600x600 LED panel for Armstrong ceiling~111,000 UZS each
Commercial linoleum71,000–100,000 UZS per m²
Carpetfrom 70,000 UZS per m²
Two-coat wall painting, laborfrom 33,000 UZS per m²
Post-renovation cleaningfrom 30,000 UZS per m²

Offices typically use drywall or glass for walls rather than brick: it's faster, cheaper, and easier to reconfigure later. Glass partitions cost more but let light into the depth of the space, which often matters more than cost savings in an open space. An Armstrong-style suspended ceiling conceals cables and ductwork while keeping them accessible. It's best to choose light fixtures together with a lighting design so workstations get enough light.

Office finishing materials on a desk next to a laptop — a visual breakdown of what an office renovation costs by finish item.

Engineering systems prices

SystemPrice
Installing a socket or switchfrom 36,000 UZS each
Data network point (SCS)from 50,000 UZS per point
Turnkey data network for 15–40 workstationsfrom 9 million UZS (~$750)
Installing a split system up to 3.5 kW350,000–700,000 UZS
VRF air conditioning system for an office up to 300 m²$8,000–15,000
Turnkey fire alarm for a small officefrom 5–10 million UZS
CCTV camera installation180,000–300,000 UZS each

Engineering is a significant part of the budget, especially for a fit-out from a bare shell. Split systems are enough for a small office. For 200–300 m² or more, a VRF system is usually installed, and you'll also need designed ventilation and air conditioning. A turnkey network for 15–40 workstations includes design, materials, installation, and testing. It's best to design low-voltage systems and power supply before finishing so you don't have to chase channels into finished walls later.

Office design project

An office interior design project in Tashkent costs from 49,000 UZS per m² for a concept option up to $20 per m² and above for a full commercial interior design. The project covers workstation and meeting-room layouts, drawings for contractors, a lighting and socket plan, and material selection. For a 200 m² office, a full project will run about $4,000 and up. With a project in hand, it's easier to put together an accurate estimate and compare contractors on the same scope of work.

Timelines

Type of renovationTimeline
Cosmetic renovationfrom 2 weeks
Major renovationfrom 4 weeks
Renovation with custom designfrom 8 weeks

An office fit-out from a bare shell with engineering systems takes longer: timelines depend on the area, equipment delivery, and approvals. The office sits idle during the renovation while rent keeps accruing. So ask the landlord about a rent-free period during the renovation: some business centers in Tashkent offer one.

Renovation vs. a move-in-ready office — which is more cost-effective

According to CMWP data from September 2026, office rent in Tashkent averages $36 per m² per month for Class A, $30 for Class B, and $25 for Class C. Landlords add 15–35% to the rate for a finished fit-out.

For a Class B office, that's $4.5–10.5 per m² per month. Over three years of rent, the premium for a finished fit-out comes to $160–380 per m² — about the same as a good turnkey renovation. If the lease is long and the office needs to suit your own needs, doing your own renovation usually pays off. If you plan to move in a year or two, a finished office is cheaper.

What needs to be approved

  • Partitions in a business center. Under the administrative regulation, reconfiguration that doesn't affect load-bearing structures doesn't require a permit. The exception is premises in multi-apartment buildings.
  • An office in a residential building. Reconfiguring non-residential premises in a multi-apartment building requires a permit, and load-bearing structures on the first floor and in the basement cannot be altered. Light drywall partitions are allowed.
  • Quiet in a residential building. As of December 11, 2026, under the noise law, noisy work in residential buildings is permitted only on weekdays from 9:00 to 18:00. The fine for officials is 10–15 BRV, which is 4.4–6.6 million UZS.
  • Fire safety. Under SHNK 2.01.02-04, combustible finishing materials cannot be used on escape routes, in lobbies, corridors, or on stairways. The fine for violating fire safety rules for officials is 3 to 10 BRV, which is 1.3–4.4 million UZS.

Who pays for renovating a rented office

Under the Civil Code, major repairs are the landlord's responsibility and routine repairs are the tenant's, unless the contract says otherwise. The landlord reimburses inseparable improvements — that is, finishing that can't be taken when you move — only if the renovation was done with their consent. So get the renovation agreed in writing before work begins.

For a company, renovation costs reduce taxable profit. Under the Tax Code, routine repairs are expensed immediately, while inseparable improvements to rented premises made with the landlord's consent are depreciated. If the contractor is a VAT payer, 12% is added to the price.

How to avoid overpaying

  • Choose an office that fits the job. A space with ready utilities and a screed floor will cost several times less to renovate than a bare concrete shell.
  • Start with a design. Planning workstations, sockets, and the network before work begins saves you from rework.
  • Use lightweight partitions. Drywall and glass go up faster than brick and are easy to change. If they don't affect load-bearing structures, no reconfiguration permit is needed in a business center, but still coordinate the layout with the landlord.
  • Don't relocate bathrooms or the kitchen. It's best to leave wet zones at the existing risers.
  • Negotiate a rent-free period. A month of free rent during renovation for a 200 m² Class B office saves about $6,000.
  • Compare estimates on the same scope. One company's price "from $120 per m²" and another's "from 260,000 UZS" can cover very different sets of work.
  • Monitor the work. Technical supervision checks concealed work before it's covered up by finishes.

If you need an office renovation from design through handover, you can order it from a single team, such as ZeroMax Group. That way one company is accountable for the design, engineering systems, and timelines. Compare proposals on more than just the price per m²: cheap estimates often leave out air conditioning, the network, and the fire alarm — and without those, the office isn't ready to work in.

Message on WhatsApp