When foundation underpinning is required
These are the typical situations where strengthening the foundation becomes necessary.
- 01Diagonal cracks in walls and plinth that widen over time
- 02Distorted door and window openings that no longer close
- 03Uneven settlement of one corner or one wall of the building
- 04Ground softened by leaking pipes, drains, pools or irrigation
- 05Foundation concrete damaged by saline groundwater and salts
- 06A planned additional floor or higher floor loads
Strengthening methods
Each method solves a different problem, and on many projects two of them are combined.
- Reinforced concrete jacket around the existing footing
- Widening of the footing to reduce pressure on the soil
- Mass concrete underpinning in short sequential sections
- Mini piles drilled through or next to the existing foundation
- Grouting or other ground improvement beneath the foundation
- New waterproofing and drainage to keep water away from the walls
How the work is done
The work begins with a foundation inspection: trial pits, concrete testing and soil sampling, plus monitoring of cracks if movement may still be active. From this the engineers determine the cause and calculate how much extra capacity is needed.
Underpinning is carried out in short sections so that only a small part of the foundation is exposed at any time. Excavations near the water table are dewatered, and the concrete is specified for the aggressive ground conditions. Each section is inspected by the engineer before concreting, and the building is monitored for movement throughout.
Dubai ground conditions
Dubai's sandy soils are generally good for shallow foundations, but they lose support when washed out or soaked by leaks, and loose fill under older villas can settle. In coastal and sabkha areas, high saline groundwater attacks concrete with chlorides and sulphates and corrodes reinforcement if the original protection was weak.
That is why foundation underpinning in Dubai often goes together with fixing the water source, renewing the waterproofing and using sulphate-resisting concrete with adequate cover. Without that, the new work faces the same conditions that damaged the old foundation.
Cost, timing and one team
Cost and duration depend on the cause of the problem, the method, the number of sections, groundwater, access around the building and the amount of reinstatement of paving and landscaping. Design and works by the same team mean that the solution is based on what was found in the ground, and changes can be made quickly if conditions differ from the drawings.
How we run a project
A clear route from the first meeting to handover of the finished building.
- 1
Consultation & site assessment
We discuss the brief, budget and constraints, then survey and measure the site.
- 2
Architectural design
We develop the concept and a full set of project documentation.
- 3
Approvals & permits
We clear the government approvals and obtain the required permits.
- 4
Estimate & planning
We prepare a detailed cost estimate, a work schedule and a delivery plan.
- 5
Construction & handover
We build and supervise on site, then hand over the finished building with full documentation.
Questions and answers
Short answers to the questions clients ask most often before a project starts. If yours is not here, write to us and we will advise on your project.
Can the foundation be strengthened without moving out?
In most cases yes. The works are done from outside or from limited areas inside, in short sections, and the building is monitored throughout.
Do I need a design for foundation underpinning?
Yes. The method, section sizes and sequence must be designed by an engineer, and structural works usually need approval from the relevant authority.
Will repairing the cracks in the walls be enough?
No. If the foundation is still moving, the cracks will reopen. First the cause is found and stopped, then the walls are repaired.
Can an additional floor be built on an old foundation?
Sometimes, after strengthening. The inspection and calculation show how much capacity is missing and which method will provide it.