What a site plan shows

A site plan package consists of several drawings, and each one serves a different group: designers, the reviewing authority, surveyors and the contractor.

  1. 01Location plan referenced to roads and neighbouring plots
  2. 02Layout of buildings, driveways, parking and outdoor areas
  3. 03Setting-out plan with coordinates of building corners
  4. 04Grading and levels plan
  5. 05Combined external services plan
  6. 06Hardscape and landscape plan
  7. 07Area schedule: plot coverage, built-up area, GFA
01

When you need site plan design

A site plan is needed for new construction, when adding a second building or an annex on the same plot, for the building permit and for utility connections. On commercial and industrial sites it shows how cars and trucks will move, where loading bays go and how Civil Defence fire tender access is provided.

For residential developments the task is more complex: play and sports areas, resident and visitor parking, waste collection points, landscaping and, where required, a DEWA substation all have to fit while keeping the required distances between buildings.

02

Levels and drainage

Even on an almost flat plot you need to decide where water goes after a storm or after irrigation. Rain in Dubai is rare but can be intense, and water collecting at entrances or basement ramps causes real damage. We set the finished floor level relative to the road, falls for driveways and paved areas, and positions of channels and gullies so water moves away from foundations. On sloping plots we add retaining walls, ramps and steps.

03

Working with Dubai plot regulations

The starting point is the affection plan, which sets the plot boundaries, permitted use, setbacks, height and coverage limits. In master communities, the developer's design guidelines add their own rules on boundary walls, parking and building position. Site plan design uses these limits to make the most of the plot: placing the villa or building within the setbacks, keeping a usable garden and pool area, and orienting rooms away from the harshest sun.

The other basis is an up-to-date topographic survey of the plot, so we request it first. The more accurate the input data, the fewer surprises during setting out and utility installation.

04

What affects the cost

Cost depends on the site area, the number of buildings, the complexity of levels, the drawing set required (layout only or a full set with grading and services) and the input data available. We confirm the price after reviewing the plot documents.

Process

How we run a project

A clear route from the first meeting to handover of the finished building.

  1. 1

    Consultation & site assessment

    We discuss the brief, budget and constraints, then survey and measure the site.

  2. 2

    Architectural design

    We develop the concept and a full set of project documentation.

  3. 3

    Approvals & permits

    We clear the government approvals and obtain the required permits.

  4. 4

    Estimate & planning

    We prepare a detailed cost estimate, a work schedule and a delivery plan.

  5. 5

    Construction & handover

    We build and supervise on site, then hand over the finished building with full documentation.

Related projects

Questions and answers

Short answers to the questions clients ask most often before a project starts. If yours is not here, write to us and we will advise on your project.

How is a site plan different from a topographic survey?

A topographic survey records what is on the plot now. A site plan shows what will be built: buildings, driveways, levels and services.

Can you prepare a site plan for a plot that already has buildings?

Yes. It is needed when adding a new building or extension, or for reconstruction. Existing structures are drawn from survey and measured data.

Does a private villa need a site plan?

Yes. The site plan is part of the building permit submission and is needed to set out the villa on the ground, even on a small plot.

What documents do you need to start?

The affection plan or plot title documents, any community design guidelines and, if available, a recent topographic survey.