Shopping mall design in Dubai: shopping mall with a curved glass facade in the evening

Shopping mall design in Dubai

Shopping mall design in Dubai: tenant mix and leasing plan, visitor and service flows, atrium structure, HVAC, smoke control, parking and loading.

Message us on WhatsApp
10+
Years of experience
15
Specialists
6
Disciplines
90+
Projects

What shopping mall design includes

The scope depends on the scale, from a neighborhood retail center to a regional mall, but any retail building needs more services and safety measures than a residential one.

  1. 01Concept and zoning: anchor tenants, galleries, food court, entertainment
  2. 02Leasing plan with a flexible unit grid
  3. 03Architectural design and facades
  4. 04Long-span and atrium structures
  5. 05HVAC, smoke control and smoke extraction
  6. 06Fire alarm, sprinklers and escape routes
  7. 07Parking, access roads and loading docks
01

Visitor and goods flows

Shoppers and goods should not cross. We design galleries, escalators and lifts so visitors pass as many shops as possible and do not reach dead ends. Anchor tenants and the food court are usually placed at the ends of routes, so people walk through the whole mall.

Service corridors, goods lifts, the loading bay and truck yard are placed on a separate side of the plot. Delivery vehicles do not get in shoppers' way, and staff do not push trolleys through the retail galleries.

02

Flexibility for tenants

Tenants change, so shopping mall design relies on a regular column grid, lightweight partitions and spare service capacity for each unit. A shop can be split or combined with its neighbor without touching the structure. Kitchen exhaust, grease drainage and gas for food and beverage units are planned in advance, together with tenant fit-out guidelines that set out what each tenant may change.

03

Safety and climate in Dubai

Malls have large spans, open atriums and many people inside, so the structure is designed from the soil investigation and the fire strategy is central to the project. Smoke control, compartments, sprinklers and evacuation are designed to the requirements of Dubai Civil Defence, and the rest of the drawings to the requirements of the relevant authority.

Summer heat puts a heavy load on air conditioning, and in Dubai the mall is where people come to escape it. We consider shading for glazed facades and skylights, entrance lobbies that limit heat ingress, the connection to district cooling or space for chillers, and roof space for plant, so running costs are considered from the start.

04

Stages of work and what affects the cost

Work moves from concept and leasing plan to schematic design, then to detailed design, approvals support and design supervision. The building is coordinated in BIM, which helps align the structure with dense services in ceiling voids.

Cost and timing depend on the area and number of floors, underground parking and atriums, the number of leasable units, the scope of MEP and the requirements of future anchor tenants. We give an estimate after studying the plot and the commercial concept.

Process

How we run a project

A clear route from the first meeting to handover of the finished building.

  1. 1

    Consultation & site assessment

    We discuss the brief, budget and constraints, then survey and measure the site.

  2. 2

    Architectural design

    We develop the concept and a full set of project documentation.

  3. 3

    Approvals & permits

    We clear the government approvals and obtain the required permits.

  4. 4

    Estimate & planning

    We prepare a detailed cost estimate, a work schedule and a delivery plan.

  5. 5

    Construction & handover

    We build and supervise on site, then hand over the finished building with full documentation.

Questions and answers

Short answers to the questions clients ask most often before a project starts. If yours is not here, write to us and we will advise on your project.

How do we design for tenants who are not yet signed?

We use a flexible unit grid and reserve service capacity, so units can be combined or split and adapted to a tenant's requirements later.

Can an existing building be converted into a mall?

Sometimes. We survey the structure and services and check whether loads, heights, escape routes and smoke control can meet retail requirements.

Does shopping mall design include fire safety?

Yes. The fire and life safety strategy, smoke control and evacuation are part of the design from the concept stage.

Can you build the mall from the design?

Yes. Design, construction and design supervision can be handled by one team.

Every remarkable project begins with a first step

From concept to delivery — we create architecture that unites aesthetics, function and engineering precision.

Message on WhatsApp